Here are the last couple of days consolidated into one posting..
Here you can see the forms holding the concrete into place while it dries on June 6th.
Here is the same angle without the forms on June 7th.
At the same time, the final set of upgrades have been submitted. The next step is to meet with Keith and do the electrical walkthrough (3-4) weeks.
At the same time, the final set of upgrades have been submitted. The next step is to meet with Keith and do the electrical walkthrough (3-4) weeks.
126 days...