Tuesday, May 06, 2008

The final day has come for the basement project.. I am very happy with the results.

The door leading down to the basement.
The main hallway.

The bar area which includes refrigerator (left) and ice maker (right).
The work shop.
The recreational room/bedroom.
The utility area. I organized the low voltage to some pegboard.
Media room.

Let the party begin.. everyone is welcome!

Monday, March 24, 2008

The drywall took longer than I thought.. They put 2-3 coats of mud on and it took a day or so, each time, to dry. But, end result, the drywall looks good.

The trim work has begun.

Most of the doors are in and the baseboards are being installed now.

I suspect that the cabinets will be going in next week.

Friday, March 07, 2008

This is the end of the second week.

All inspections have been completed and the drywall is being dropped off (and hung) on Monday.

Here is the final view of the basement (I thought I would try video this time) just prior to the drywall going up.

Monday, March 03, 2008

Lots has happened this week (and weekend).

On Monday, they threw up a ton of 2x4's and finished all the framing. Here is a quick picture of the media room. The wire loop is for future sconces.

The electricians came out on Friday and today (Monday). They finished their rough in. Here is a picture of a step lights.

Low voltage (computer, TV, etc.) was installed on Saturday. Here is a picture of two conduits which terminate in the bedroom closet as well as some of the cables that were pulled.

This picture shows the combined efforts of the framers, plumbers (they came out on Tuesday) as well as electricans. This is "B's Bar" - drinks anyone?


Next step is to have the City inspect the electrial work. Then we will be ready for drywall (maybe Friday)....

Friday, February 22, 2008

I am floored. I thought, as Americans, we totally forgot about what GOOD customer service means. Heck, it’s all about making money as fast as possible no matter what, right? Don’t let anyone get in your way… Well, not for Donnie (construction manager for Homes by Brumby, LLC). Let me explain.

I just got a call from Donnie informing me that they would NOT be starting today. It has been raining for the last 24 hours and they didn’t want to track in mud and tear up my yard. So, Donnie took 96 seconds to call me and inform me of this. Instead of me wondering what was going on, a short phone call was all it took to communicate effectively and reset my expectations. He advised me that they have rescheduled for Monday.

Ok, I don’t want to sound cheesy, but.. GOOD customer service is hard to find these days. And, I am getting EXCELLENT customer service. Am I making a “mountain out of a mole hill?” Yes, but, it’s VERY important to me. Isn’t it important to you, that is, to get respected and appreciated by those who you do business with? A simple “Thank you” goes a LONG way for me.

This, again, re-enforces my decision of selecting Homes by Brumby, LCC as the GC for my basement project.

Thank you, Donnie. J

Thursday, February 21, 2008

Today, reality strikes – the initial set of lumber was delivered and the basement project has officially begun (and so has the rain). I have been told that the framers will be here tomorrow morning.

Here is a picture of the lumber they will be using.. I can’t imagine it will take them long to do their part.

Tuesday, February 12, 2008

It’s me.. I’m back exactly 4 months later with an update.

Today, I signed an agreement to have the basement finished! I am very excited.

My tireless process to select a GC to do the job was fairly sgtraight forward. I opted to get 4 quotes and asked for the EXACT same thing from each of them. The quotes, for the most part, were bunched up together (cost wise) fairly well. So I began to look at the “warm and fuzzy” factor. Meaning, who did I get the best response from, who has provided the most feedback, who was willing to go that extra mile, etc.

I have selected ‘Homes by Brumby, LLC’ to finish the basement.

I feel very comfortable about my decision. I will be working with the same crew I worked with when I built the house. Same quality product with the same quality crew.

The timeline is about 60 days to complete the basement. I will be posting progress photos, like before, on this blog. If you have not signed up for updates, click the “subscribe me” link to the right.