The drywall took longer than I thought.. They put 2-3 coats of mud on and it took a day or so, each time, to dry. But, end result, the drywall looks good.
The trim work has begun. Most of the doors are in and the baseboards are being installed now.
I suspect that the cabinets will be going in next week.